CCNA 4 v6.0 Chapter 3 SIC PPP, Routing, and Remote Access VPN – PT Skills Assessment Option 2 | CCNA5.NET

  • 31/01/2018 04:01
  • 78

Note: All device console passwords are cisco. All device enable passwords are class.

Step 1 Configure HDLC on router Storage.

Configure the WAN link from router Storage to ISP_1  using HDLC encapsulation.

Step 2 Configure PPP to connect Corp to ISP_1.

Configure the WAN link from router Corp to ISP_1  using PPP encapsulation and CHAP authentication.

  • Create a user ISP_1 with the password of cisco123.

Step 3 Configure eBGP routing.

a.  Configure router Corp with eBGP routing.

  • Configure Corp to peer with ISP_1.
  • Add only Corp 10.1.1.0/24 internal network to BGP.

b.  Configure router Remote with eBGP routing.

  • Configure Remote to peer with ISP_1.
  • Add the Remote internal network to BGP

Step 4 Configure GRE Tunneling.

a.  Configure router Corp with a tunnel interface to send IP traffic over GRE to Remote.

  • Configure Tunnel 1 with appropriate addressing information.
  • Configure the tunnel source with the local exit interface.
  • Configure the tunnel destination with the appropriate endpoint IP address.

b.  Configure router Remote with a tunnel interface to send IP traffic over GRE to Corp.

  • Configure Tunnel 1 with appropriate addressing information.
  • Configure the tunnel source with the local exit interface.
  • Configure the tunnel destination with the appropriate endpoint IP address.

Step 5 Configure OSPF Routing.

The Remote LAN must have connectivity to the Corp LAN. Configure OSPF across the GRE tunnel.

  • Configure OSPF process 10 on the Remote router.
  • Backup should advertise the LAN network via OSPF.
  • Backup should be configured to form an adjacency Corp over the GRE tunnel.
  • Disable OSPF updates on appropriate interface(s).

Step 6 Configure OSPF Routing.

The Corp LAN must have connectivity to the Remote LAN. Configure OSPF across the GRE tunnel.

  • Configure OSPF process 10 on the Corp router.
  • Corp should advertise both LAN networks via OSPF.
  • Corp should be configured to form an adjacency with Remote over the GRE tunnel.
  • Disable OSPF updates on appropriate interface(s).

Step 7 Connectivity.

a.  Verify full connectivity from Corp_PC1 to the Web_Server in the Storage network.

b.  Verify full connectivity from Teleworker1 to Web_Server in the Storage network.

قالب وردپرس


Bình luận

About Us

CCNA v5 Answers, CCNA v5 Blog, CCNA 5 Blog, CCNA Blog

Articles

Our Contacts